Concrete Quantity Calculator
Concrete volume and order volume for slabs, footings, walls, beams and columns, with overage and optional bags.
Runs on your device Processed locally in your browser. Nothing is uploaded.
Excavation volume for a rectangular or circular pit, shaft, trench or footing, with optional swell and truck loads.
Volume and haul planning only—not excavation safety, slope approval, shoring or protective-system advice. Artwork is illustrative. This is an independent reference prototype, not a production engine or certified engineering design.
Results are provided for guidance. Check them against the applicable rules and your professional judgement before relying on them.
This excavation calculator works out earthwork volume for a rectangular pit, circular pit or shaft, trench, or footing pit — common shapes used for everyday earthwork quantity checks.
Unit conversions are exact: 1 mm = 0.001 m, 1 cm = 0.01 m, 1 inch = 0.0254 m and 1 foot = 0.3048 m, so 1 ft³ = 0.028316846592 m³ and 1 yd³ = 0.764554857984 m³ exactly. Volumes are kept at full precision and rounded only for display using your 2, 3, or 4 decimal-place selection. That selection also sets the accepted decimal precision for the swell percentage; it does not alter existing values or the formula.
Bank volume vs. loose volume. Bank volume is the size of the hole itself. Once dug, soil no longer packs as tightly, so the same soil occupies more space; that is the loose volume you haul. Swell varies by soil type and moisture content, so it is an approximate estimate you set — not an engineering constant — and it is listed with the result whenever it is used.
Truck capacity is yours to enter. Trucks carry very different usable volumes, so the calculator never assumes one.
This calculator gives geometric volume only, for vertical-sided rectangular or circular excavations. It does not cover side slopes or battered excavation, slope stability, shoring design, excavation safety compliance, dewatering, geotechnical design, disposal cost, or backfill compaction.
A 20 × 0.6 × 1 m trench with a 25% swell estimate and trucks carrying 6 m³ per load:
| Input | |
|---|---|
| Excavation type | Trench |
| Unit | m |
| Length | 20 |
| Width | 0.6 |
| Depth | 1 |
| Same-size excavations | 1 |
| Swell / bulking % | 25% |
| Usable truck volume | 6 |
| Truck volume unit | m³ |
| Result | |
| Bank (in-place) excavation volume (m³) | 12.000 |
| Bank (in-place) excavation volume (yd³) | 15.70 |
| Bank (in-place) excavation volume (ft³) | 423.78 |
| Swell used | 25% |
| Loose volume after swell (m³) | 15.000 |
| Loose volume after swell (yd³) | 19.62 |
| Truck loads (rounded up) | 3 |
| Same-size excavations | 1 |
Choose "Trench", enter the trench's length, width, and depth in one unit, and the number of identical trench runs. A trench uses the same length × width × depth formula as a pit.
Choose "Footing pit" and enter the pit's length, width, and depth. The excavation type changes only the label, not the arithmetic.
Choose "Circular pit / shaft", then enter its diameter, depth, and the number of identical excavations. The calculator uses π × (diameter² ÷ 4) × depth × quantity and keeps the full result precision internally.
Bank volume is the excavation as measured in the ground. Loose volume adds swell, since dug soil takes up more space. Use bank volume to describe the excavation and loose volume when estimating material to move or haul.
It depends on the soil and its moisture, and published figures vary. Use a figure from your site investigation, contractor or supplier, and treat the result as an estimate. Leave it at 0% to see bank volume only.
Enter the loose volume one truck actually carries on your job. The calculator divides the loose volume by it and rounds up to whole loads.
No. This is an estimation aid for planning and quantity checks, not a final billing quantity or a certified bill of quantities. Actual site quantities can differ due to soil conditions, over-excavation, side slopes, shoring, compaction, and local measurement rules — verify quantities before excavation, purchase, billing, or construction, and confirm the final figures with a licensed engineer, architect, contractor, or professional quantity surveyor.